Electric Utilities: Transmission & Substations · Transmission Interconnection & Substation Build · Dominion Energy Virginia
Transmission Interconnection & Substation Build Project Manager Simulation — Dominion Energy Virginia
Lead Dominion Energy Virginia's $84M project to tie a 70 MW gas and diesel microgrid to the 115 kV grid: a new hybrid 115/69/34.5 kV substation, a 12-mile overhead line and the PJM interconnection, while a Navy depot, a trauma hospital and a shipyard stay powered through every outage window. Then the regulator approves seventy cents on the dollar, and you have to decide what can wait. Gain hands-on project management experience over 27 days of real decisions, stakeholders, and PMO deliverables — no prior experience required.
Client: Dominion Energy · Standalone project
Live PMO Membership, $99/month, cancel anytime. You begin with this project and unlock the full library.
The scenario
Marlow Point has kept its lights on for twenty-five years by standing a little apart. Dominion Energy Virginia built the 70 MW microgrid there in 1999, after Hurricane Floyd, so the Navy depot behind the fence would never again wait on a storm-battered grid. Marlow Regional Medical Center and the drydocks at Marlow Marine Works joined later. Two 25 MW gas turbines and ten diesel units carry about 41 MW of load, tied to the rest of Dominion's system by a single 34.5 kV circuit that can move only 8 MW. When the grid stumbles, Marlow Point islands itself, about twice a summer, and nobody inside the fence notices. That arrangement has run out of road. The turbines run about 6,000 hours a year doing a job the grid could do more cheaply and cleanly. The Navy wants a second source it can count on. And Seaboard Landing, a subsea cable landing station and data center, has signed for 69 kV service on a date its cable consortium fixed two years ago. The answer Dominion filed with the State Corporation Commission is an $84.0 million interconnection: a new hybrid 115/69/34.5 kV substation beside the old Marlow Yard switchyard, a 12-mile 115 kV line to the Garrison Road station, and the PJM studies and agreements that let power flow both ways. You are the project manager. The transformers have a factory slot that expires on Friday, the SCC has not ruled on the filing, and four customers have each been promised an energization date by someone other than you. Your job is to connect Marlow Point to the grid without a single unplanned interruption to the people who cannot have one, and to decide, when the money changes, what can wait.
What you'll do as the project manager
- →Energize Marlow Substation and the 115 kV line within 30 months of Charter approval, with up to 50 MW of two-way exchange at the Garrison Road PCC.
- →Have the 69 kV bay ready for Seaboard Landing by month 28, the in-service date in its service agreement.
- →Zero unplanned interruptions to the Navy depot, Marlow Regional Medical Center and Marlow Marine Works during construction, tie-in and commissioning.
- →Finish inside the budget the SCC approves for cost recovery, with every deferral documented and accepted by the person who owns its risk.
- →Cut Marlow Point gas turbine run-hours by at least 60% in the first full year after energization by importing grid power for base load.
Project management skills you'll build
The challenges you'll navigate
- •The SCC approves less than the $84.0M filed, forcing deferrals after equipment is ordered.
- •Losing the Hitachi Energy transformer slots pushes energization out by about two years.
- •A tie-in outage at Marlow Yard interrupts the hospital or the Navy depot.
- •One unsigned parcel or a wetlands permit delay holds the 115 kV line.
- •PJM's Facilities Study identifies upgrades or protection changes that are not in the estimate.
Technology & stakeholders
You'll manage 8 stakeholders, including Lionel Gaskins (Vice President, Transmission & Substation Projects), Maribel Strickland (Director, Major Projects (Electric Transmission)), Ifeoma Ezeani (Principal Engineer, Protection & Control), and more.
What you'll walk away with
A verified, shareable record of a completed enterprise project — plus the PMO deliverables you produced along the way (charter, project plan, SteerCo deck, closure document). It's real, demonstrable project management experience you can put on your resume and speak to in interviews.
Start this simulation today
Build real PM experience by leading this enterprise project from initiation through phase gates.
The Eddie System Live PMO Membership
$99/month. Cancel anytime.
- ✓This complete enterprise project simulation
- ✓Access to 80+ realistic PM simulations
- ✓PM templates and real PMO deliverables
- ✓Live PMO phase-gate sessions with feedback
- ✓Community access, replays, and training
- ✓Resume-backed project stories you can speak to in interviews
You will begin with this project and unlock the full Live PMO membership. Secure checkout by Stripe.
Frequently asked questions
Do I need project management experience to start?
No. This simulation is built for aspiring and practicing project managers alike — you learn by doing. You make real decisions and get feedback, with no PMP or prior PM job required.
How long does this simulation take?
It runs over 27 days, roughly 24 minutes per day, covering the full project lifecycle from initiation to closure.
What will I learn?
You practice the core of project management — stakeholder management, budget and schedule control, risk, scope, and PMO governance — in the context of transmission interconnection & substation build in electric utilities: transmission & substations.
What does it cost?
This simulation is included in The Eddie System Live PMO Membership: $99/month, cancel anytime. One membership unlocks this project plus the full simulation library, PM templates and deliverables, live phase-gate sessions, replays, and community access.
What happens after I join?
Your platform access is instant: log in with the email you joined with and start Day 1 of this simulation. Your invite to the private community (Skool) arrives shortly after joining, included in your membership.
Is this based on the real Dominion Energy Virginia?
No, and The Eddie System is not affiliated with, endorsed by, or sponsored by Dominion Energy Virginia. It is a realistic training scenario inspired by Dominion Energy Virginia and the Electric Utilities: Transmission & Substations sector. Details, names, and events are fictionalized for training. It is a simulation, not a record of any actual project.
What do I get at the end?
A verified project completion plus the PMO deliverables you produced (charter, plan, SteerCo deck, closure) — proof of hands-on experience you can show employers.
Related simulations
HF Sinclair
Refinery Tank Inspection Program — API 653 Annual Cycle
Tank Inspection Program / Mechanical Integrity
Pembina Pipeline Corporation
Brownfield Compressor Station Tie-In
Brownfield Capital Project / Midstream Construction
Marathon Petroleum
Hydrotreater Catalyst Replacement — Marathon Petroleum Garyville
Refinery Turnaround / Catalyst Replacement
Ready to gain real PM experience?
Run Dominion Energy Virginia's transmission interconnection & substation build and 79+ more enterprise simulations.
Dominion Energy Virginia and related marks are trademarks of their respective owners. The Eddie System is not affiliated with, endorsed by, or sponsored by Dominion Energy Virginia. This simulation is a fictionalized training scenario inspired by publicly known context; it is not a record of any actual project.
The Eddie System Managed by Atlas